Paris, Texas

Cunningham Backhoe Service was contracted by Spiral Weld in Paris, Texas, to prepare the foundation footings for a new facility. Known for producing large-diameter concrete-lined steel pipe, the company required precise, heavy-duty excavation to support their specialized operations. Even with the distance from his Oklahoma base, Frank Cunningham was the clear choice, valued for consistently delivering quality work in less time and at an economical rate.

Project Challenges & Site Conditions

The site’s soil presented unique challenges, with a high clay content that made the material sticky and heavy. To make the soil workable, the contractor applied a soil and moisture conditioner, added water, and covered the area with a plastic sheet to retain moisture. While such conditions can slow excavation, Frank’s skill ensured the process remained efficient and accurate. The facility’s layout also included adjacent train tracks used for hauling materials, requiring careful maneuvering and safety considerations.

Work Performed

Using his backhoe, Frank excavated the foundation footings to exact specifications, ensuring they would support the heavy loads and structural demands of the facility. Coordination with other crews was key, particularly in working around ongoing site preparations and materials handling.

Outcome

The footings were completed on schedule and to precise standards, setting the stage for a facility capable of producing up to 8-foot-diameter concrete-lined steel pipes—critical infrastructure for water lines that resist corrosion. The client’s operations will benefit from a strong, reliable foundation that supports the handling of heavy materials and industrial-scale production.

 

Whether it’s working in challenging clay soil or traveling across state lines to meet a client’s needs, Frank brings the same commitment to precision, speed, and cost efficiency—earning repeat business and trust on every job.